Validate beforeyou build

01 / 03

Waterfall

Rigid. Everything validated at the very end.

02 / 03

Agile

Faster — but still validates after the build.

03 / 03

Relay

Connected. Validation moves to the start.

The cost of validating late

Requirements live in one tool. The work happens in another.

Documentation goes stale the moment a sprint begins.

So the business only sees the truth at UAT —

— after the build, when change costs the most.

The shift

Validation moves to the start.

Requirements

Capture intent as structured, living requirements.

Simulate

Turn them into interactive workflow simulations.

Validate

The business signs off — before engineering starts.

Generate

Stories, acceptance criteria and tests, generated.

Build

Engineering starts from a validated backlog.

One requirement in

Relay reads the intent and generates the entire validation-ready plan — before anyone opens a ticket.

A validated plan out

  • Workflow

    Portal → verify address → confirm → save

  • Screen simulation

    Interactive address-update form

  • User stories

    As a member, I can update my address from the portal.

  • Acceptance criteria

    Given a verified address, when saved, then the record updates.

  • Validation rules

    Address must pass USPS verification before save.

  • Test scenarios

    Invalid ZIP · expired session · concurrent edit

  • Implementation tasks

    API · form component · validation service · tests

Capabilities

01

Living Documentation

Requirements stay synchronized with every delivery artifact, evolving as the work does.

02

Workflow Simulation

Validate business processes interactively — before a line of code is written.

03

AI Story Generation

Epics, stories, subtasks and acceptance criteria, generated from intent.

04

UAT-First Delivery

Move user acceptance to the beginning, not the end, of the lifecycle.

05

Enterprise Collaboration

Business, product, engineering and QA, working in one environment.

06

Delivery Intelligence

Full traceability across requirements, stories, workflows and testing.

07

Delivery Orchestration

Connected execution across every team and system you ship with.

The system of record

Everything connected. Everything traceable.

Requirements → documentation → stories → workflows → QA → UAT, linked through one intelligent core.

Outcomes

0% less rework.0% faster UAT cycles.No surprises at the end.

Stop discovering problemsafter the build.

Validate workflows, requirements, and experiences before engineering begins.